Full Biomass Burner ; Extra Milestone - Aquila
Hey there,
i am a little confused about the Full Biomass Production and Burning it throu Full Biomass Burner.
My Thoughts on the Math:
40 /minTimber to 30 /min Wood (100% Constructor)
30 /min Wood to 15 /min (2m³) Organic Liquids (100% Melting Furnace)
15 /min (2m³) Organic Liquids to 15 /min (2m³) Full Biomass + Byproduct (Carbon) (150% Cooldown Station)
All fine until now.
Full Biomass Burner (Default = 5,14 m³/min)
Tat should be 3* 97.2833% equal to the Production of 15/min of the cool down Station, right ?
atm i have the 6 Full Buimass Burner at 194.5667% and the cooldown Station runs about 60% efficiency..
Thats burning 60m³/min at a 15m³/min production raid.



2 Replies
Hmm, they are too powerful in the current version? It should get more per minute ? I think i made a mistake in the MW each m3 has in the Full Biomass. Maybe put them at half power?
atm i have them all 6x 250% and there running on 15m³/min