Switching from Vercel to Neon billing
Hi, we currently have a database on Neon which was created through the Vercel integration. However, we'd like to upgrade without Vercel's billing, so we are looking if there's a way to transfer the project to a Neon organization instead, or convert the existing Vercel org on the Neon console to a regular Neon org.