R
Railway4mo ago
Ashwin

0 downtime deploys not working

Hey guys, need help - it says application is not responding in between my deploys
Solution:
Pulling out of the call, not only we recommended healthchecks, but you can optionally set up: RAILWAY_DEPLOYMENT_OVERLAP_SECONDS to control the rollout behavior. More info: https://docs.railway.app/reference/variables#user-provided-configuration-variables...
Railway Docs
Variables | Railway Docs
Documentation for Railway
Jump to solution
21 Replies
Percy
Percy4mo ago
Project ID: 4a0df985-35b6-4603-a042-c608c7e94037
Ashwin
Ashwin4mo ago
4a0df985-35b6-4603-a042-c608c7e94037
Brody
Brody4mo ago
do you have a volume?
Ashwin
Ashwin4mo ago
not attached to the instance i'm having this issue with other instances in the same project have a volume
Brody
Brody4mo ago
how long are you seeing the railway page for?
Ashwin
Ashwin4mo ago
haven't timed exactly but i'd guess for less than a minute
Brody
Brody4mo ago
are you using a readiness healthcheck? https://docs.railway.app/reference/healthchecks
Ashwin
Ashwin4mo ago
i'm not (and i have in the past when i faced this issue, and it did not solve it) - bit afraid to update rn as we're getting a bunch of traffic atm
Brody
Brody4mo ago
it can help, so i would recommend doing it when you have the downtime, along with setting a service variable RAILWAY_DEPLOYMENT_OVERLAP_SECONDS to 35 (default is 20)
Ashwin
Ashwin4mo ago
cool, will do so and report back thanks!
Brody
Brody4mo ago
no prob
angelo
angelo4mo ago
Hey there Ashwin, https://cal.com/angelo-railway/30min we can jump on a call and help sort this out for you and your team. (tagging @Ashwin since you are are on DnD)
Ashwin
Ashwin4mo ago
appreciate it, just booked a call
angelo
angelo4mo ago
@Ashwin - mind if we can do somthing today, I am trying to clear up my Wednesdays for code
Ashwin
Ashwin4mo ago
i was hoping for something today too but this was the only available time slot
angelo
angelo4mo ago
Weird, wanna do in 4 mins? I just got out of my call.
Ashwin
Ashwin4mo ago
yep works
angelo
angelo4mo ago
Moved the event
Ashwin
Ashwin4mo ago
perfect
Solution
angelo
angelo4mo ago
Pulling out of the call, not only we recommended healthchecks, but you can optionally set up: RAILWAY_DEPLOYMENT_OVERLAP_SECONDS to control the rollout behavior. More info: https://docs.railway.app/reference/variables#user-provided-configuration-variables
Railway Docs
Variables | Railway Docs
Documentation for Railway
angelo
angelo4mo ago
Closing thread!