W
Windmill10mo ago
ym1198

schedule in different workspaces with same name override each other

If i create schedule with name ABC in workspace 1 and schedule with name ABC in workspace 2, workspace 2 schedule ABC runs perfectly but schedule ABC is not scheduled anymore in workspace 1. When I again enable for workspace 1, now workspace 2 schedule ABC gets stopped (enabled but does not set new jobs for future) @rubenf please take a look (seems low priority for most people). For now, i am using different names
8 Replies
rubenf
rubenf10mo ago
Are you sure it's sufficient to just create the schedules, you didn't have to do anything else ? and is the schedule disabled, or it's just that the schedule doesn't trigger new runs even though it's enabled ? i'm not able to easily reproduce. Could you give me reproduction steps on a vanilla setup ?
ym1198
ym119810mo ago
it's just that the schedule doesn't trigger new runs even though it's enabled This is the issue What I did was : Create schedule ABC every 1 min on workspace 1 & enabled => Future job is created Create schedule ABC every 1 min on workspace 2 & enabled => Future job is created Now in workspace 1 , future job will stop getting created. Though it remains enabled. When i gave different names to both, both works simultaneously
rubenf
rubenf10mo ago
let me attempt to recreate right now
ym1198
ym119810mo ago
I tested this with 3 workspaces, issue was there
rubenf
rubenf10mo ago
👍 @ym1198 just to be sure on the reproduct, it will stop getting created but it won't delete the next future job right ? I can reproduce thanks Found the issue and fixed it, thanks a lot for this report, this is a really bad bug
ym1198
ym119810mo ago
already created future job of workspace 1 -> it won't but need to check but will stop creating new
rubenf
rubenf10mo ago
yup yup found the issue
ym1198
ym119810mo ago
👍
Want results from more Discord servers?
Add your server
More Posts